Ten hours of focused consultancy set a restaurant on course towards DKK 1 million in annual savings

Gastroplan's restaurant consultant helped conduct a focused ten-hour review and optimisation of the kitchen. The head chef took strong ownership of the project and implemented many of the changes, supported by ongoing input from Gastroplan during peak periods.

Target for the project

Target: DKK 1 million in annual savings

Chefs working at their stations in a professional restaurant kitchen
White-label - kitchen optimisation targeting DKK 1 million in annual savings logo

Case facts

Client type
Restaurant
Assignment
Kitchen optimisation, expansion, recipes and workflows
Gastroplan time commitment
Ten hours plus ongoing assistance during peak periods
Services
Kitchen review, recipe optimisation and operational support

The challenge

The restaurant was preparing to expand and needed to ensure that the kitchen's capacity, workflows and recipes could keep pace.

Production bottlenecks made it harder to use the kitchen's time and resources effectively. The recipes also needed to be reviewed so that they supported a more efficient flow and more consistent production.

What we found

The review showed that many smaller improvements could combine to create significant financial potential.

The main opportunities were to:

  • Reduce bottlenecks between kitchen stations.
  • Adapt workflows to the expansion.
  • Review recipes with production and capacity in mind.
  • Remove unnecessary preparation steps.
  • Improve the allocation of tasks during the busiest periods.

What we implemented

Gastroplan reviewed the kitchen's layout, capacity and workflows and advised on how the expansion could support day-to-day operations.

All relevant recipes were reviewed with a focus on removing unnecessary steps and minimising production bottlenecks.

The head chef invested considerable energy in the project and was responsible for much of the implementation. Gastroplan's role was therefore focused and practical: ten hours of targeted consultancy followed by ongoing assistance and advice when demand was highest during peak periods.

Target for the project

The target and expected potential

The restaurant has set a target of saving DKK 1 million a year and is well under way with the changes required to realise those savings.

The work has delivered:

  • Fewer kitchen bottlenecks.
  • More efficient workflows.
  • Recipes better suited to production.
  • Better use of kitchen capacity.
  • Strong internal ownership from the head chef.
  • A clear plan for reaching the target of DKK 1 million in annual savings.

This case shows that a consultancy engagement does not have to be lengthy to create value. When the internal management team takes ownership, a few focused hours and ongoing support can initiate substantial improvements.

Explore more case studies

White-label - restaurant group with three locations logo

Restaurant group saved more than DKK 500,000 a year

More than DKK 500,000 in annual savings

Read the case study
White-label - small plates, table plan and kitchen tickets logo

Switching from large dishes to small plates increased revenue

Higher revenue and faster service

Read the case study
White-label - cafe optimised production and staffing logo

Cafe avoided additional hires and saved DKK 200,000

Approx. DKK 200,000 saved without additional hires

Read the case study